Rope access technician operating a hydraulic jack and dial gauge on a soil nailed highway retaining wall

QLD TMR MRTS03 · TfNSW Compliant

Independent ground anchor & soil nail testing services

Suitability and acceptance testing for civil contractors, builders, and asset owners across Queensland and New South Wales. NATA-calibrated equipment, IRATA Level 3 rope access, and field records signed off before we leave site.

TMR MRTS03TfNSW TS 02168.1TfNSW TS 02163NATA-calibrated equipmentIRATA Level 3

Our Services

Two testing regimes, one specialist scope

We only test. That independence is what makes our records defensible when a hold point is on the line.

To ultimate

Suitability Testing

Sacrificial nails loaded in cycles to the ultimate geotechnical strength under TfNSW TS 02168.1 (or the load nominated by your designer in Queensland) to validate bond stress assumptions before production installation begins.

  • Sacrificial (non-production) nails
  • Four-cycle loading, 180 minute creep hold
  • Grout/ground bond stress derivation
1.5× DWL

Acceptance Testing

Production nails loaded to 1.5 times the design working load with multi-cycle creep and deflection monitoring recorded against the governing specification's acceptance criteria.

  • Production nails, distributed across the lot
  • Multi-cycle creep monitoring
  • Deflection recorded to 0.01 mm

Compliance & Accreditations

Calibrated, certified, accepted

Traceable equipment and current certification on every mobilisation.

NATA-Calibrated Equipment

High-precision dial gauges reading to 0.01 mm and hydraulic jacks carrying valid NATA calibration certificates, serialised on every field record.

Rope Access Capabilities

IRATA Level 3 supervised technicians for steep batter, cliff face and limited-access retaining wall testing — no scaffold or EWP delays.

Specification Compliant

Testing and reporting strictly to Queensland TMR MRTS03, Transport for NSW TS 02168.1 and TS 02163, or your custom project specification.

Governing Standards

The specifications we test to

Our testing regimes and reports are structured against the engineering and transport standards that govern ground anchor and soil nail works in Queensland and New South Wales.

TMR MRTS03 (Queensland)

Queensland Department of Transport and Main Roads Specification MRTS03 — Drainage, Retaining Structures and Protective Coatings. Clause 49 governs soil nailing, including acceptance testing of production nails to 1.5 times the design working load. MRTS03 is the reference specification for most QLD civil and roadworks contracts.

TfNSW Geotechnical Specifications

Transport for NSW specifications TS 02168.1 (soil nailing — suitability and acceptance testing) and TS 02163 (post-tensioned ground anchors), including multi-cycle loading, creep monitoring and elastic extension verification requirements.

AS 4678 & BS 8081

Australian Standard AS 4678 (Earth-retaining structures) and BS 8081 (Code of practice for ground anchorages) underpin anchor design and testing practice nationally. Where a project specification nominates these standards, our test procedures and reporting follow them directly.

Service Areas

Mobilisation across Queensland and New South Wales

Based in Queensland, we mobilise testing crews and calibrated equipment to civil, building and infrastructure projects across both states.

Queensland

Brisbane, Gold Coast, Sunshine Coast, Toowoomba and regional Queensland — including road, rail and resources infrastructure projects under TMR MRTS03.

New South Wales

Sydney, Newcastle, Wollongong and regional NSW — transport and civil infrastructure projects under TfNSW geotechnical specifications.

Planning Tool

Size your acceptance testing scope

Enter your production nail count and we'll apply the MRTS03 Table 49.5 rates or the TfNSW TS 02168.1 percentages, rounded up.

Test Frequency Calculator

MRTS03 Table 49.5 — acceptance (pull-out) testing

Up to 50 nails: 3 tests · 51–100 nails: 6 tests · Over 100 nails: 6%

Required acceptance tests

6

51 to 100 nails — minimum 6 pull-out tests

Suitability tests

Not specified

MRTS03 prescribes a single acceptance (pull-out) regime at 1.5 × working load. Any pre-construction sacrificial testing is set by the designer or Superintendent.

Program-aligned mobilisation

Planned mobilisation across Queensland and New South Wales, scheduled around your hold points and construction sequence.

Same-day field records

Signed load/displacement records issued before we demobilise from site.

Audit-ready reporting

Formatted to the governing spec with calibration certificates appended.

Have a wall going up next month?

Send us the shoring drawings and the spec. You'll have a priced testing scope with mobilisation windows inside one business day.

Request a Testing Quote