Project types

Typical applications for soil nail and ground anchor testing

A visual guide to the structures testing applies to — rock cuttings, anchored retaining walls, steep batters and basement shoring — and how a test is set up on each.

Illustrative gallery

Typical structures and test setups

These images illustrate the types of slope stabilisation and ground anchor works our testing supports. They are representative examples of the work environment, not a claim of engagement on any specific project.

Highway rock cutting — soil nails and shotcrete

Regional highway widening, South East Queensland

Highway rock cutting — soil nails and shotcrete

Sacrificial suitability nails tested to the ultimate geotechnical strength ahead of production, then acceptance testing on production nails at the specified frequency with dial gauge deflection readings taken from an independent reference beam.

Anchored soldier pile retaining wall

Urban road corridor and rail interface works

Anchored soldier pile retaining wall

Ground anchor proof/acceptance testing through the waler using a hollow-ram jack and calibrated pressure gauge, with lock-off load verified and creep recorded at the maximum test load.

Steep batter stabilisation with mesh and nails

Cliff face and high-batter slope remediation

Steep batter stabilisation with mesh and nails

IRATA Level 3 supervised rope access testing where no platform access exists — reaction frame rigged off the face and the same load/hold regime applied as at ground level.

Temporary anchored basement shoring

CBD basement excavation, tiered anchored walls

Temporary anchored basement shoring

Suitability testing on trial anchors before the shoring sequence commences, followed by acceptance testing on production anchors at each level prior to excavation of the next lift.

Images on this page are illustrative of typical slope stabilisation and anchoring works. They are used to show where and how testing is carried out and do not represent projects tested by Ground Anchor Testing (GAT). Client project records are confidential and released only with written permission.

Have a structure like one of these?

Send through the nail or anchor schedule, design working load and access conditions and we will return a scoped testing proposal.

Request a testing quote